INSTALLATION PROFILE
Planning example — Service amperage: documented during the site assessment. Panel context: base-building distribution and available capacity shape the charging plan. Charger count: phased workplace ports sized to the operating need. Charger category: pedestal, dual-port, or wall-mount equipment selected by site conditions. Planned load: modelled before final equipment selection. Management strategy: networked charging and load management where useful. Run distance: measured after route confirmation. Civil scope: trenching, bollards, and reinstatement are confirmed from the site survey. Commissioning: electrical tests, network activation, access setup, and handover. Installation gallery: electrical context, charger locations, and completed site work.

LOCATION
Hamilton, ON
SITE TYPE
Workplace
INSTALLED POWER
120 kW
INSTALLATION PLANNING PROFILE
INSTALLATION GALLERY