INSTALLATION PROFILE

Foundry Works

Foundry Works

Foundry Works

Planning example — Service amperage: documented during the site assessment. Panel context: base-building distribution and available capacity shape the charging plan. Charger count: phased workplace ports sized to the operating need. Charger category: pedestal, dual-port, or wall-mount equipment selected by site conditions. Planned load: modelled before final equipment selection. Management strategy: networked charging and load management where useful. Run distance: measured after route confirmation. Civil scope: trenching, bollards, and reinstatement are confirmed from the site survey. Commissioning: electrical tests, network activation, access setup, and handover. Installation gallery: electrical context, charger locations, and completed site work.

LOCATION

Hamilton, ON

SITE TYPE

Workplace

INSTALLED POWER

120 kW

INSTALLATION PLANNING PROFILE

INSTALLATION GALLERY

Site context, equipment placement, and completed infrastructure.

Site context, equipment placement, and completed infrastructure.

Bring the site. We’ll map the charging plan.

Request assessment

VOLTGRID

EV charging plans for homes, workplaces, and fleets—built around the site and the load.

Create a free website with Framer, the website builder loved by startups, designers and agencies.