INSTALLATION PROFILE

North Route Depot

North Route Depot

North Route Depot

Planning example — Service amperage: utility and depot service data are reviewed before design. Panel context: charging distribution is coordinated with fleet duty cycles and existing loads. Charger count: phased to match the operating plan. Charger category: managed fleet charging selected for vehicle mix and dwell time. Planned load: scheduled across the overnight window. Management strategy: networked load allocation with expansion capacity preserved. Run distance: verified between distribution, parking, and charging positions. Civil scope: route work, protection, foundations, and reinstatement are defined after survey. Commissioning: electrical validation, network setup, charging tests, and operations handover. Installation gallery: depot context, charging positions, and completed infrastructure.

LOCATION

Mississauga, ON

SITE TYPE

Fleet

INSTALLED POWER

360 kW

INSTALLATION PLANNING PROFILE

INSTALLATION GALLERY

Site context, equipment placement, and completed infrastructure.

Site context, equipment placement, and completed infrastructure.

Bring the site. We’ll map the charging plan.

Request assessment

VOLTGRID

EV charging plans for homes, workplaces, and fleets—built around the site and the load.

Create a free website with Framer, the website builder loved by startups, designers and agencies.